Add or subtract years, months, weeks, days, hours and minutes from any date. Month-end clamping, ISO week number and a copyable ISO 8601 stamp.
Counting forward on a wall calendar works fine until the span crosses a month boundary, and then the answer starts depending on a convention nobody writes down. Date Add / Subtract Calculator makes that convention visible instead of guessing on your behalf. You pick a start date, say how many years, months, weeks, days, hours and minutes to move by, and decide what should happen when the landing day does not exist in the month it arrives in.
Every figure is computed on UTC instants, so a daylight-saving switch inside your range never adds or drops an hour behind your back. Along with the date itself you get the weekday, the ISO week, the position in the year, and an ISO 8601 stamp ready to paste into a contract, a ticket or a config file.
Press Load Sample. Start datefills with 2010-12-31 and Months with 2. The answer comes back as Monday, 28 February 2011— ISO 8601 2011-02-28, ISO week 2011-W09, day 59 of the year, a net shift of 59 days. February has no 31st, so the landing day was pulled back to the month’s real last day and an amber note names the day that was dropped. Press Load Sample a second time and a different start date arrives with the same two-month shift still applied, which makes the clamping rule easy to test against a date you choose yourself.
Order of operations decides the result here, and the order is not arbitrary. Years and months are folded into a single month count and applied first; weeks, days, hours and minutes are then added as a flat span of milliseconds. Swap those two stages and you get a different date whenever a month end is involved: 31 January plus one month plus one day is 1 March, while 31 January plus one day plus one month is 28 February. Month-first is what dateutil.relativedelta and most SQL dialects do, and it matches what people mean when they say “a month from then”, so it is the order used here.
2011-03-03 rather than 2011-02-28, because the three-day overflow spills into March instead of stopping at February’s last day.2024-02-29 plus 1 year clamps to 2025-02-28.Start
Duration to add
Chips stack onto whatever is already in the field — three presses of + 1 week reads as 3 weeks.